Venda quente Monel 400 Alloy Tubo Tubo Sem Costura
$10≥100Kilogram
Tipo de pagamento: | L/C,T/T |
Incoterm: | FOB,CFR,CIF,EXW |
Quantidade de pedido mínimo: | 100 Kilogram |
transporte: | Ocean,Land,Air |
$10≥100Kilogram
Tipo de pagamento: | L/C,T/T |
Incoterm: | FOB,CFR,CIF,EXW |
Quantidade de pedido mínimo: | 100 Kilogram |
transporte: | Ocean,Land,Air |
Application: Construction, Industry
Alloy Or Not: Is Alloy
Section Shape: Round
Special Pipe: Thick Wall Pipe
Outer Diameter: 12 - 300 Mm
Thickness: 0.8 - 50 Mm
Standard: Astm, Din, Jis, Bs, Gb, Api, Astm A312-2007, Astm A234-2
Processing Service: Bending, Cutting
Tolerance: ±1%
Unidades de venda | : | Kilogram |
Aplicativo
• Escada rolante, elevador, portas
•Mobiliário
• Ferramentas de produção, utensílios de cozinha, freezers, câmaras frigoríficas
•Autopeças
• Maquinário e Embalagem
• Equipamentos e dispositivos médicos
•Sistema de transporte
Monel 400 mostra alta resistência e excelente resistência à corrosão em uma variedade de ambientes ácidos e alcalinos e é especialmente adequado para reduzir as condições. [22] Ele também tem boa ductilidade e condutividade térmica. O Monel 400 normalmente encontra aplicação em engenharia naval, processamento químico e de hidrocarbonetos, trocadores de calor, válvulas e bombas. É coberto pelas seguintes normas: BS 3075, 3076 NA 13, DTD 204B e ASTM B164.
01. Material |
Steel Grade |
Monel 400 |
Material Type |
Available in cold rolled and hot rolled |
|
02. Alloy Series |
Hastelloy C276, Hastelloy C22, Hastelloy B3, Hastelloy B2, Hastelloy X ... Incoloy 825, Incoloy 800, Incoloy 925, Incoloy 901 ... Inconel 600, Inconel 601, Inconel 625, Inconel 718, Inconel x-750 ... Monel 400, Monel k500, Monel 404 ... Nimonic 80a, Nimonic 75, Nimonic 90 ... Alloy20, Alloy28, Alloy75; Nickle 200, Nickle 201, GH3030, GH2132, Invar36 etc.
|
|
03. Application |
Construction, machine structure, agriculture equipment, water and gas pipes etc. |
|
04. Standard |
GB, UNS, DIN, ASTM, ASME |
|
05. Packing |
Standard export packing |
|
06. Delivery Time |
1.10days after receving the deposit of T/T 2.10days after receving the L/C original |
|
07. Trade Terms |
FOB, CFR, CIF etc. |
|
08. Loading Port |
Shanghai,Ningbo |
|
09. Payment Terms |
1.30%T/T in advance, the balance against the B/L copy 2.30%T/T in advance, the balance against the L/C at sight |
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.